Griffith Uni: N79 – New Academic Building

The New Academic Building provides 6 levels of accommodation for professional and academic staff and students. The building includes office space, specialized laboratories, workshops, informal learning spaces, engagement spaces, a simulation studio and rooftop plantroom.

Sector:

Mixed Use
Modern mixed-use building with vertical ribbed facade, surrounded by eucalyptus trees and pedestrians in urban plaza setting.

Mechanical Plant:

  • Water cooled variable flow chiller plant
  • Variable volume Air Handling plant
  • Pressure controlled Lab’s with multi-mode set up of fume cupboards
  • General and Toilet ventilation systems

Scope of works

  • Complete commissioning package (fixed price)
  • Air balancing
  • VAV calibration / commissioning
  • Commissioning programming and co-ordination