. Origin Energy Accommodation Fit-out – BES – Building Environment Solutions

Origin Energy Accommodation Fit-out

Origin Energy consolidated their footprint from two premises to one within the premium commercial tower 180 Ann Street, Brisbane CBD. The fit out was across eight floors with a total floor area of 16,000m2 and contains the Brisbane City Control Room (BCCR).

Sector:

Office

Mechanical Plant:

  • Central variable volume air handling plant
  • Tenant condensor water (CW)
  • Water Cooled Package Units (WCPU)
  • Underfloor CRAC units
  • Stairwell pressurisation – Zone Pressurisation system

Scope of works

  • Air & Hydronic balancing
  • Pre-commission cleaning of tenant CW circuits using mobile pump station and Side Stream Filtration.
  • Calibration of VAV’s
  • Building Enclosure Testing (Air Tightness) testing of underfloor plenum serving BCCR
  • Stairwell pressurisation testing