Sunshine Coast University hospital was a $1.8 billion project that opened in 2017 with 450 beds and gradually increasing to 738 beds by 2021. BES were engaged for the stage 2 operating theatre expansion works.
Sector:
Healthcare
Mechanical Plant:
Cardiac Operating Theatres
Hybrid Operating Theatres
PC2 Wet Lab
Scope of works
Complete commissioning package (fixed price)
Building Enclosure Testing (Air Tightness) or operating theatres and associated Ante Rooms.